These major construction and renovation projects are coordinated and managed by the Capital Development team and usually meet the following criteria:

  • Outlined in the Campus Development Plan.
  • Involve new construction (i.e. LRC), complex construction (i.e. a building addition) and/or major campus refurbishment.
  • Initiated by the Senior Executive Team and approved by the Board of Governors.
  • Wholly or partially funded through Humber's Central Funds budget.
  • Usually require funding of one million dollars or more.
  • Require permits and/or infrastructure upgrades to facilitate the new construction.
  • Involve multiple stakeholders.

Current Projects

Humber is preparing for the future by retrofitting the heating and cooling system at the North Campus. The project SWITCH, part of the Integrated Energy Master Plan (IEMP), is instrumental in helping Humber reach next zero by 2050. 

This project consists of repurposing a Study room as a one-stop location for all archival work and services.

Upgrades are being performed on the current space to create a multi-purpose space for Health Sciences. Finishes, millwork, lighting, furniture and technology are all being upgraded. Project will be completed September 2023.

A new student Town Square is being created as part of the retail space redevelopment at North Campus.  The Town Square allows for a new gathering space for students, located centrally within the campus, where informal learning and sharing of information can take place.  In addition, thi

Humber College North Campus is the planned western termination of the new Light Rapid Transit (LRT) line along Finch Avenue West, with a below-grade station on the SW intersection of Highway 27 & Humber College Boulevard, anticipated for completion December 2023.

Humber is continually working to embody our institutional value to preserve our collective future. All campus development and operations begin by incorporating sustainability into the design and building process and connecting students to real-world learning opportunities.

A creative focal point at Lakeshore Campus, the 365,000 sq. ft. Humber Cultural Hub (HCH) will spark exciting possibilities for students, local cultural and creative industries, and the community.

Completed Projects

Due to extensive growth in the Esthetician and Spa Management Program the Longo Faculty of Business is repurposing the resource labs H305 & H303 at the North Campus into a new spa lab. Project was completed in August 2023, in time for Fall 2023 start up.

New multi-deck 1,000 car parking structure. Completed January 2018. Construction of a new multi-deck 1,000 car parking structure replaced the surface lot capacity lost due to the construction of the new Centre for Technology Innovation (CTI) as well as increasing overall capacity. The solar panel array on the parking garage roof generates enough energy to make the CTI a net-zero building.

Within the Faculty of Health and Wellness, a new HIS lab was developed providing multi-use space that is used as both a patient clinic and an instructional classroom/lab with Portable Hearing Booths.  Similarly, a new “Idea Lab” was developed at the Centre of Entrepreneurship at the Lakeshor

Phases 1-4 have been completed providing new part time faculty space, full time faculty space and administrative spaces for work placements and coordinators.