Arboretum Blvd Closure

Please note that Arboretum Blvd will be closed along the Parking Garage construction site on Tuesday, July 31, 2018 from 8 a.m. to 4 p.m. See attached diagram.

  • All vehicles that require access to Parking Lot 1, the Residence Buildings, Humber’s Child Daycare, and Humber Arboretum & Centre for Urban Ecology must use Entrance ‘E’ from Humber College Blvd.
  • The closure is necessary to accommodate a portable crane on the Arboretum Blvd roadway to install structural components of the rooftop solar array on the new parking garage. A second road closure will be required later in August 2018.
  • The road may reopen earlier in the day if possible.