Corridor Closure: NX Building, North Campus

May 3, 2016

The 2nd floor corridor in NX Building will be closed from Wednesday, May 4th and opening Saturday, May 14th for ceiling installation in relation to Contract A Backfill renovations. 

The corridor will be taped off using caution tape and signage to direct people to alternate routes installed.

The majority of the work in the corridor will be installing the drywall ceiling board as the metal framing work has already been completed in anticipation so there will be minimal materials and tools, however the procedure is in place to ensure a clear walkway.