Facilities

August 10, 2023
Please note that the pedestrian bridge between N building and Guelph-Humber at North Campus will remain closed for construction until end of day August 14." All other outside entrances to these... Read more
July 31, 2023
The ramp connecting the ground floor of buildings H and E will be temporarily closed from Friday, August 4 to Friday, August 11 for floor and wall tiling. A temporary ramp will be built for... Read more
July 24, 2023
As part of the Finch West Light Rail Transit (LRT) Project, crews will be doing road works at Humber College Blvd and Hwy 27. The work is scheduled from July 24 to August 14, 2023 and will last... Read more
July 21, 2023
A roofing project at Lakeshore Campus West-B Building is scheduled to begin Monday, July 24 with completion scheduled for the end of September (weather permitting). Adjacent walkway(s) in this area... Read more
July 21, 2023
In order to accommodate repair of the perma pavers in front of LRC building, the east side of the loop will be temporarily closed for traffic starting on July 25. The west side of the loop will... Read more

Pages