Craning to deliver materials for the solar installation project at Building B will be taking place starting on Saturday, November 20 between 7:30 a.m. and noon.
Access to the northwest portion of Arboretum Blvd along Building B will be blocked during this time. There will be no access to Lot 15. Arboretum Blvd may be accessed from the east side.