Craning to deliver materials for the Solar installation project at Building B will be taking place starting on Saturday, October 16 at 7 a.m.
Access to the northwest portion of Arboretum Blvd along B building will be blocked. There will be no access to Lot 15. Arboretum Blvd may be accessed from the east side.