Construction Notice for August 22-26

Metrolinx is preparing the road for the eventual extension of President’s Way to a new campus entrance on Highway 27 as part of the Finch West LRT project.

North Campus traffic on Arboretum Blvd near Lot 4 between Humber College Blvd and Spruce Vista will be restricted to one lane in each direction from August 22 to 26. This will include shutting down the sidewalk at the intersection of Spruce Vista and Arboretum Blvd on the north side and the sidewalk along Parking Lot 4. While cars will still have access, no pedestrian traffic will have access to walk through Entrance A along Arboretum Blvd.

Details are provided in the enclosed map. Please be prepared for some travel delays during this time.