Road Closure for Bridge Install

Please note that the CTI contractor (Bird) is scheduled to erect steel bridge components from the LRC/N-buildings to the new CTI building on Saturday, October 21, 2017. This will require the complete closure of the Silver Bell Lane roadway leading to the Humber shipping and receiving area. 

No deliveries can be made to/from Humber shipping and receiving area during this time.

Please note the following details:

Date of Closure Saturday, October 21, 2017
Duration 7:00 a.m. to 6:00 p.m.
Details
  • Bird and their subcontractor bill bring in a large portable crane to lift structural steel components into place for a new bridge between LRC/N-building and the new CTI building. 
  • Silver Bell Lane will be shut down near the LRC building. 
  • No deliveries can be made to/from Humber shipping and receiving area during this time.

Thank you for your patience and understanding during this work.